VDC High Rate Analysis
From APEXwiki
Group: Ole Hansen (leader), Michael Paolone, Seamus Riordan, Guy Ron
Priority Tasks
1) Modify VDC track reconstruction software to handle events with multiple tracks
(a) Implement a 3-parameter fit routine for VDC clusters to obtain cluster time
offset t_0 (Michael Paolone) Status
(b) Modify U-V cluster matching code to exploit t_0 correlations (Ole Hansen)
2) Simulations
(a) Adapt existing "VDCsim" toy Monte Carlo to APEX conditions (NN) (b) Test code modifications with VDCsim-generated tracks (all)
3) Analyze available 0.5 MHz data (all)
4) Prepare for online analysis
(a) Write/retrieve scripts for VDC reference time calibration (Nilanga?/Seamus)
(b) Develop procedure and write script to re-calibrate time-to-distance
relation with lower chamber high voltage (Seamus)
Optional, for offline analysis
1) Optimize tracking efficiency
(a) Modify cluster finding code (or a different relevant part of the tracking code)
to handle overlapping (partially "corrupt") clusters (Ole, Guy?)
(b) [additional items TBD]
