Group: John LeRose (leader), Paul Brindza, Ed Folts, Jack Segal

Priority Tasks

  • Provide schedule for installation and calibration for the June Run Plan
  • Determine maximum momentum for septa
  • Develop the beam line configuration
  • Provide the beam line plan to RadCon for calculation of the radiation
  • What need to be monitored regarding the beam parameters:
    - the raw spectrum for each signal, because ADC could be saturated
    - the beam positions 
    - the raster currents
    - the rate of given trigger vs the raster currents
  • Monitor beam energy:see Entry number 318811