Group: John LeRose (leader), Paul Brindza, Ed Folts, Jack Segal
Priority Tasks
- Provide schedule for installation and calibration for the June Run Plan
- Determine maximum momentum for septa
- Develop the beam line configuration
- Provide the beam line plan to RadCon for calculation of the radiation
- What need to be monitored regarding the beam parameters:
- the raw spectrum for each signal, because ADC could be saturated
- the beam positions
- the raster currents
- the rate of given trigger vs the raster currents
- Monitor beam energy:see Entry number 318811